Underground mine inflow modeling with MODFLOW6, Flopy and Mf6Voronoi - Tutorial

An applied example of modeling the development of underground mine works with time based on a Voronoi mesh MOFLOW 6 model. The case consists of 5 mine levels developed over 5 years that cross the underground water body at determined lengths. The numerical model is developed with Python, Flopy and Mf6Voronoi for spatial discretization, implementation of the boundary conditions based on geospatial data, model build/simulation and 3d representation on Paraview.

Tutorial

Input data

https://owncloud.hatarilabs.com/s/C4THHvNulEflw7n

Password to download data: Hatarilabs.